System: P100
Capacity: 35 Kg/H (77 Lbs/H)
Field of Utilization: Clinics and Small Hospital
Description
- Compact Design
- Sliding Doors (open and close)
- Fully automated and more efficient
- User-friendly and more user-friendly interface
- Intended hospital use
- Electric steam generator
- Minimized sound
- Minimized odor
- No vibration
- Minimal water use
- No waste water produced
- Easy Mobility (transport)
We are Design and production certified by TUV Austria. Produced according to EU Directives PED (2014/68/EU) 2006/42/EC, 2014/30/EU & EU Norms EN285
1. Odor Control System Microwave-induced
2. Sterilization Process
3. Automatic elevator system for easy loading
PHOTOS
GET FREE QUOTE
Please fill out the form, and one of our sales executives will contact you back.
At the beginning of the cycle, once the upper lid opens, the operator loads the waste in the loading chamber.
LOADING
STERILIZATION STAGE #1
The shredder, controlled by the PLC, changes rotation direction due to the “anti-blocking” capability preventing the blades from getting jammed. During the shredding process, the waste is treated with microwave generated by 6 integrated magnetron units (Optional)
Our special design shredder is capable of grinding very hard materials like surgical stainless steel instruments and hard ceramics.
STERILIZATION STAGE #2
SHREDDING/MICROWAVE
Heating is achieved by injecting saturated steam until the homogeneous temperature in the upper and lower chamber reaches 134°C (274 F). Sterilization is completed by maintaining 134°C (274 F) - 138 °C (280 F) temperature and equivalent pressure for a period of 10 – 15 minutes.
These factors provide the possibility to decrease the pathogenic contamination level in the medical waste by 8 Log 10 value.
HEATING/STERILIZATION
STERILIZATION STAGE #3
Excess steam in the chamber is removed during the cooling phase and the temperature of the grinded sterilized waste is lowered by injecting cold air into the chamber of the autoclave.
The condensed water, that is sterile and can be safely discharged into the sewage system is drained with the help of positive pressure or vacuum.
COOLING & DRAINING
STERILIZATION STAGE #4
Excess steam in the chamber is removed during the cooling phase and the temperature of the grinded sterilized waste is lowered by injecting cold air into the chamber of the autoclave.
The condensed water, that is sterile and can be safely discharged into the sewage system is drained with the help of positive pressure or vacuum.
UNLOADING
STERILIZATION STAGE #5
PROMED P50, P100, P150
SPECIFICATIONS
Technical Features | Value |
---|---|
Size (L x W x H) (mm) | 2400 x 1450 x 1900 |
Weight (Kg) | 2680 |
Air Pressure (Bar max) | 8 |
Electrical connection required (Kw) | 30* |
Working Characteristics | Value |
Sterilizing Capacity (Kg/ Hour) | 25-35 |
Process Volume Capacity (Lt.) | 150 |
Average Waste Density (Kg/m3) | 100 – 150 |
Average Cycle Time (Min.) | 140 |
Maximum Steam Flow (Kg/Hour) | 100 |
Sterilization Efficiency (SAL) | 8 Log10 |
Consumption / Cycle | Value |
Steam (Kg) | 7 |
Electricity (Kw) | 1.5** |
Water (Lt) | None*** |
Special Consumables | None |
All Systems can be customized to customer specification
GET FREE QUOTE